Net Metering in Hyderabad 2026 — TSSPDCL & TSNPDCL Process, Tariff & Benefits

Export Surplus Solar · Earn Bill Credits · TSSPDCL & TSNPDCL · End-to-End Handled

Net metering allows your solar system to feed surplus electricity back to the TSSPDCL or TSNPDCL grid, earning you bill credits for every unit you export. In Hyderabad, a well-sized solar system generates more power than your home consumes during daytime hours — net metering converts that surplus into tangible savings on your electricity bill.

₹0Export Charge
BidirectionalMeter Installed
TSSPDCL& TSNPDCL
7–15 DaysTypical Approval
7–15Days to Approval
100%Bill Offset Possible
MonthlyCredit Settlement
TSRE260936Our TGREDCO Reg.

What is Net Metering?

Net metering is a billing mechanism that credits solar energy system owners for the electricity they add to the grid. When your solar panels produce more electricity than you consume — which happens regularly between 10 AM and 3 PM on sunny days — the surplus flows back into the TSSPDCL distribution network through your bi-directional meter.

At the end of each billing cycle, your DISCOM calculates your net consumption:

Net Metering Formula:
Net Bill = (Units Imported from Grid × Tariff) − (Units Exported to Grid × Credit Rate)

If your exported units exceed imported units in a billing period, the surplus credits carry forward to the next month — you are never paid cash for excess generation under the residential net metering scheme in Telangana.

For example: If your 3kW solar system generates 400 units in a month, you consume 250 units at home during daytime, and export 150 units to the grid — your bill is reduced by the credit value of those 150 exported units. You only pay for the net 100 units you drew from the grid at night.

How Net Metering Works in Hyderabad — Day by Day

🌅
Morning (6–9 AM)

Solar generation ramps up. Your home draws from panels as generation increases. Meter imports from grid only for the gap.

☀️
Midday (10 AM–3 PM)

Peak solar generation. System produces more than home consumes. Surplus units flow to the TSSPDCL grid. Meter records export.

🌇
Evening (4–8 PM)

Solar generation drops. Home draws from the grid. Meter records import. ACs and appliances run on grid power.

🌙
Night (8 PM–6 AM)

No solar generation. Home runs entirely on grid power. Units imported are recorded by meter for monthly billing.

📊
Monthly Bill Settlement

TSSPDCL generates your bill: net units (imported minus exported) × applicable slab tariff. Credits carry forward if exports exceed imports.

💡
Result

A well-sized solar system on net metering can reduce your monthly bill by 70–100%, with zero upfront grid charges for exporting surplus.

Net Metering Tariff in Hyderabad — TSSPDCL & TSNPDCL

Telangana follows a net billing model (not a gross metering / feed-in tariff model). This means exported units are settled against your consumption bill at the consumption tariff rate — not at a separately declared lower export rate.

Consumer CategorySettlement BasisCash Payment?Credit Carry-Forward?
Residential (LT-I)Monthly net billing at consumption tariff rateNo — bill credit onlyYes — indefinitely
Commercial (LT-II / LT-III)Monthly net billing — varies by categoryNo — bill credit onlyYes — check with DISCOM
Agricultural (LT-V)Not applicable under standard net metering
HT consumers (Industrial)Separate gross metering / wheeling arrangementsSubject to PPAVaries
Tariff note: Net metering tariffs, settlement periods, and DISCOM processes are subject to revision by TSERC (Telangana State Electricity Regulatory Commission). The rates and settlement terms described here reflect the policy framework as of 2026. Always verify current applicable rates with TSSPDCL or TSNPDCL at the time of your installation. Sri Ishaan Solar will provide the latest applicable terms in your net metering agreement.

TSSPDCL vs TSNPDCL — Which DISCOM Covers Your Area?

Telangana has two electricity distribution companies. Knowing which one serves your area is essential before applying for net metering:

DISCOMCoverage AreaHeadquartersNet Metering Portal
TSSPDCL
Telangana Southern Power Distribution Company
Hyderabad (GHMC), Rangareddy, Medchal-Malkajgiri, Vikarabad, Mahbubnagar, Nalgonda, Suryapet, Yadadri, Khammam, Bhadradri, Jogulamba, Wanaparthy, Nagarkurnool, Narayanpet Hyderabad tssouthernpower.com
TSNPDCL
Telangana Northern Power Distribution Company
Nizamabad, Karimnagar, Warangal, Adilabad, Komaram Bheem, Nirmal, Mancherial, Peddapalli, Jayashankar, Mulugu, Bhupalapally, Mahabubabad, Jangaon, Hanamkonda, Siddipet, Kamareddy, Rajanna Sircilla, Medak, Sangareddy Warangal tsnorthernpower.com
Quick check: Look at the top of your electricity bill. The DISCOM name is printed clearly — either "TSSPDCL" or "TSNPDCL." Your consumer number also identifies the DISCOM. Sri Ishaan Solar handles net metering applications with both DISCOMs across all of Telangana.

Net Metering Application Process — 7 Steps

The complete net metering process from initial application to your first net-billed electricity statement typically takes 4–6 weeks, including installation. Here is the exact sequence:

  1. Feasibility Assessment

    Sri Ishaan Solar visits your site, assesses your roof, reviews your existing DISCOM connection details (sanctioned load, consumer category), and confirms net metering eligibility. Systems must be within your sanctioned load limit.

  2. DISCOM Pre-Approval Application

    We submit a net metering pre-approval application to TSSPDCL or TSNPDCL with your consumer details, proposed solar system capacity, and a single-line diagram (SLD). The DISCOM verifies feasibility of connecting your system to their grid segment.

  3. Solar System Installation

    Once pre-approval is received, Sri Ishaan Solar installs your solar panels, string inverter, DCDB, ACDB, earthing, and all DC/AC wiring. Installation takes 1–3 days depending on system size. The system is kept offline (not energised to the grid) until DISCOM inspection.

  4. DISCOM Technical Inspection

    A TSSPDCL/TSNPDCL engineer visits your premises to inspect the installed solar system — checking panel count, inverter ratings, wiring, earthing, and compliance with DISCOM technical standards. Sri Ishaan Solar's TGREDCO empanelment (TSRE260936) is required for this inspection to be scheduled.

  5. Bi-Directional Meter Installation

    After inspection clearance, TSSPDCL/TSNPDCL replaces your existing single-direction meter with a bi-directional (net) meter. This meter records both import and export separately. The meter installation is done by DISCOM technicians — not the solar installer.

  6. Net Metering Agreement Signing

    You sign a net metering agreement with the DISCOM specifying the terms: settlement period (monthly), credit carry-forward terms, applicable tariff category, and system capacity. Sri Ishaan Solar assists with reviewing and completing this agreement.

  7. First Net-Billed Statement

    Your next electricity bill from TSSPDCL/TSNPDCL will show both import and export readings. The net bill = imports minus export credits. If you are on the PM Surya Ghar scheme, the ₹78,000 subsidy is also credited to your bank account within 30 days of inspection approval.

Documents Required for Net Metering Application

DocumentNotes
Latest electricity billShows consumer number, sanctioned load, DISCOM division
Proof of ownership / NOCSale deed or NOC from property owner if applicant is tenant
Aadhaar card of applicantFor identity verification and PM Surya Ghar portal registration
Bank account detailsFor PMSG subsidy disbursement (₹78,000 credited directly)
Solar system technical datasheetPanel make/model/wattage, inverter make/model/rating — prepared by installer
Single-line diagram (SLD)Prepared by Sri Ishaan Solar — shows system layout, protection devices, grid connection point
TGREDCO installer registration certificateSri Ishaan Solar Reg. TSRE260936 — required for DISCOM to process application
Net metering application formDISCOM-specific form — Sri Ishaan Solar fills and submits on your behalf
Sri Ishaan Solar handles the entire net metering process: DISCOM pre-approval application, SLD preparation, inspection scheduling and coordination, bi-directional meter follow-up, and net metering agreement review. You provide the documents; we do everything else. This service is included in every solar installation we do — there is no separate net metering processing fee.

Get Net Metering Done — We Handle Everything

TGREDCO-empanelled · TSSPDCL & TSNPDCL approved · Pre-approval to bi-directional meter in 4–6 weeks

Why Net Metering Gets Delayed or Rejected — Common Reasons

Net metering applications in Hyderabad are frequently delayed — sometimes by months — due to avoidable errors. Here are the most common reasons and how Sri Ishaan Solar prevents them:

Reason for Delay / RejectionHow We Prevent It
Installer not TGREDCO-empanelledSri Ishaan Solar is empanelled under TSRE260936 — mandatory for DISCOM to process your application
Proposed capacity exceeds sanctioned loadWe check your sanctioned load before system sizing — solar capacity must not exceed it
Incomplete or incorrect SLDOur engineers prepare DISCOM-compliant single-line diagrams with all required protection device details
Wrong meter type installed (non-BIS)We only use BIS-certified bi-directional meters accepted by TSSPDCL/TSNPDCL
Missing consumer documentsWe provide a complete document checklist and verify all documents before submission
Inspection not coordinated in timeWe follow up with DISCOM division office directly to schedule inspection promptly after installation
System installed before pre-approvalWe never start installation without DISCOM pre-approval — avoids rejection risk
Risk alert — Unempanelled installers: Many small solar contractors in Hyderabad are not TGREDCO-empanelled. If you install solar with such a contractor, TSSPDCL will refuse to process your net metering application entirely. You would need to either re-apply through an empanelled installer or forgo net metering — losing a significant portion of your system's economic benefit. Always verify TGREDCO registration before signing with any solar installer.

Frequently Asked Questions — Net Metering Hyderabad

What is net metering in Hyderabad and how does it work?
Net metering is a billing arrangement where your solar system's surplus electricity is exported to the TSSPDCL grid, and those exported units are credited against the units you draw from the grid. A bi-directional meter records both import and export. At billing time: Net Bill = (units imported × tariff) − (units exported × credit rate). If exports exceed imports in a month, the surplus credit carries forward — you never receive cash for excess generation under the residential scheme.
How long does TSSPDCL net metering approval take in Hyderabad?
With a TGREDCO-empanelled installer and complete documents, TSSPDCL net metering approval takes 7–15 working days. The full process from application to first net-billed statement (including installation) takes 4–6 weeks. Delays occur when documents are incomplete, the installer is not empanelled, or the proposed solar capacity exceeds your sanctioned load. Sri Ishaan Solar's track record with DISCOM offices across Hyderabad ensures minimal delays.
What is the TSSPDCL net metering tariff in Hyderabad?
Under Telangana's net metering policy, residential consumers do not receive a separate feed-in tariff cash payment. Exported units are settled monthly at the consumption tariff rate — the exported units offset your import bill at whatever slab rate applies to your LT-I connection. This is net billing at consumption tariff. Verify current rates with TSSPDCL at time of installation as TSERC revises tariffs periodically.
Which DISCOM covers Hyderabad — TSSPDCL or TSNPDCL?
Hyderabad city (GHMC area), Rangareddy, and Medchal-Malkajgiri fall under TSSPDCL. North Telangana districts including Nizamabad, Karimnagar, Warangal, and Adilabad fall under TSNPDCL. Check the header of your electricity bill — it clearly states which DISCOM you are under. Sri Ishaan Solar handles net metering applications with both DISCOMs.
What documents are needed for TSSPDCL net metering application?
Required documents: latest electricity bill, proof of ownership (or NOC from owner if tenant), Aadhaar card, bank account details for PMSG subsidy, solar system technical datasheet, single-line diagram (prepared by Sri Ishaan Solar), TGREDCO installer registration certificate (TSRE260936), and the DISCOM net metering application form. Sri Ishaan Solar prepares all technical documents and submits the application on your behalf.

Book a Free Site Visit — We Handle Net Metering End-to-End

We assess your system, file the DISCOM pre-approval, handle inspection, and get your bi-directional meter installed — so you start earning bill credits as fast as possible.

TGREDCO Reg. TSRE260936 · GSTIN 36AFXFS2132K1ZG · Bandlaguda, Hyderabad