🇮🇳 Government Scheme · Telangana

PM Surya Ghar (PMSG) — Up to ₹78,000 Solar Subsidy in Telangana PMSG central ₹78,000 + — handled end-to-end

Sri Ishaan Solar is TGREDCO-empanelled (Reg. TSRE260936) — we file your central + state subsidy applications, handle TSSPDCL/TSNPDCL net metering, and install your system. You provide documents; we do everything else.

💬 WhatsApp — Free Site Survey 📞 +91 78424 61888

Home · Services · PM Surya Ghar Subsidy

What is PM Surya Ghar Muft Bijli Yojana?

Launched in February 2024, PM Surya Ghar Muft Bijli Yojana (PMSG) is the Government of India's flagship rooftop solar scheme aimed at one crore Indian households. It provides direct bank-credit subsidy plus 300 free units of monthly electricity for residential consumers who install grid-tied rooftop solar.

For Telangana residents, the central PMSG benefit is layered with an additional state-level top-up under the Telangana Solar Policy 2024. The combined benefit for a 3 kW or larger system is up to ₹78,000.

⚡ Combined subsidy structure (3 kW+ residential)

Subsidy Slab — Central PMSG

System SizePMSG Per kWPMSG Total
1 kW₹30,000₹30,000
2 kW₹30,000₹60,000
3 kW₹30,000 (1st kW) + ₹18,000 (2nd & 3rd kW)₹78,000
4 kW+20% of benchmark cost on capacity above 3 kW₹78,000 (residential cap)
Society common-area₹18,000 / kW (group housing track)Up to ₹18 lakh per society

is paid in addition to the above and is confirmed at site survey.

Eligibility

End-to-End Process — 6 Steps

  1. Free site survey + sizingOur engineer visits your roof in Hyderabad/Telangana, measures usable area, checks shade, and recommends size based on your monthly bill. Free, no commitment.
  2. PM Surya Ghar registrationWe register on pmsuryaghar.gov.in with your consumer number + Aadhaar + bank details. We also file the parallel Telangana state application on TGREDCO portal.
  3. DISCOM feasibility approvalTSSPDCL/TSNPDCL inspects roof + load and issues feasibility letter (7–15 days).
  4. Vendor mapping + installationWe're already empanelled (TGREDCO TSRE260936), so vendor mapping is automatic. Installation: 7–10 days. We use BIS-certified Tier-1 panels (Adani / Waaree / Tata) and DCR-compliant inverters.
  5. Net meter + inspection + commissioningDISCOM installs bi-directional net meter (15–30 days), then inspects and commissions the system. Commissioning report is uploaded automatically.
  6. Subsidy creditedPMSG central subsidy credited to your bank account within 30 days post-commissioning. follows separately. You'll see two distinct credits.

Want us to handle everything?

No paperwork on your side. Free site survey. TGREDCO-empanelled. 100+ installations since 2017.

💬 WhatsApp Us 📞 Call +91 78424 61888

Documents Needed

Why Sri Ishaan Solar for PMSG?

What you getWith Sri Ishaan Solar
TGREDCO empanelled vendor✅ Reg. TSRE260936
Years in businessSince 2017 — 100+ installations
Capacity installed500+ kW across Telangana
End-to-end paperwork✅ PMSG + state + DISCOM net meter — all handled
Site survey✅ Free, no commitment
Workmanship warranty5 years (in addition to 25-yr panel warranty)
Tier-1 panels only✅ Adani / Waaree / Tata — BIS-certified, DCR-compliant
LanguagesEnglish · Telugu · Hindi

Frequently Asked Questions

What is the PM Surya Ghar subsidy in Telangana?

PMSG is a central scheme offering up to ₹78,000 for residential rooftop solar of 3 kW+ (₹30,000 for 1 kW, ₹60,000 for 2 kW). PMSG is the only direct rooftop solar subsidy currently active for 3 kW+ systems.

Who is eligible?

Indian residents with a residential TSSPDCL/TSNPDCL connection, valid Aadhaar, and rooftop ownership or NOC. One subsidy per household. Rented and commercial properties are not eligible.

How long does the PMSG process take?

30–60 days end-to-end. Site survey: 2–3 days. DISCOM feasibility: 7–15 days. Installation: 7–10 days. Net meter + inspection: 15–30 days. Subsidy credit: 30 days post-commissioning.

Do I apply separately for the ?

Currently PMSG is the only active rooftop solar subsidy. We handle the full PMSG application end-to-end via the National Portal + DISCOM.

What's your charge for PMSG facilitation?

Zero separate fee. PMSG + state subsidy assistance is bundled into our standard installation package — site survey is free, paperwork is free.

Can apartments apply?

Individual flat owners cannot apply directly. Apartment common-area solar must be applied via the RWA/society and gets ₹18,000/kW under the group-housing track.

What happens if my application is rejected?

Common rejection reasons: wrong consumer number, insufficient roof shade-free area, duplicate application. We diagnose and resubmit at no extra charge.

💬 Chat WhatsApp