Telangana residents can claim up to ₹78,000 subsidy for residential rooftop solar under the central PM Surya Ghar Muft Bijli Yojana (PMSG). Here's exactly how to apply and what you'll receive.
- PMSG central subsidy: ₹78,000 maximum (Government of India)
- Telangana state top-up: None — no separate state scheme is currently active
- Total subsidy: ₹78,000
Subsidy Amount — Central PMSG (2026 Rates)
| System Size | PMSG Per kW | PMSG Central Total |
|---|---|---|
| 1 kW | ₹30,000 | ₹30,000 |
| 2 kW | ₹30,000 | ₹60,000 |
| 3 kW | ₹30,000 + ₹18,000 | ₹78,000 |
| 4 kW+ | 20% of benchmark cost | ₹78,000 (max for residential) |
Who is Eligible?
- Indian resident with a residential electricity connection
- Must own the property (or have owner's NOC)
- Roof must have adequate space (~100 sq ft per kW)
- Single-phase connection: up to 5 kW
- Three-phase connection: up to 10 kW+
- Only one subsidy per household
Step-by-Step Application Process
Step 1: Register on PM Surya Ghar Portal
Visit pmsuryaghar.gov.in and register with:
- Your TGSPDCL/TGSPDCL consumer number (on your electricity bill)
- Aadhaar number
- Mobile number
- Bank account details (for direct subsidy transfer)
Step 2: Submit Application
- Select your state (Telangana) and DISCOM
- Choose system size (we recommend 3 kW for most homes — maximum subsidy)
- Upload electricity bill copy
- Upload roof photo
Step 3: Feasibility Approval
TGSPDCL/TGSPDCL reviews your application and issues feasibility approval (usually 7-15 days).
Step 4: Choose an Empanelled Vendor
Select a registered vendor from the portal list. Sri Ishaan Solar is an empanelled installer — we handle all paperwork for you.
Step 5: Installation + Net Meter
Your vendor installs the solar system and applies for net metering. DISCOM installs the bi-directional meter (usually within 15-30 days after installation).
Step 6: Commissioning + Subsidy
After DISCOM inspection and commissioning, subsidy is credited directly to your bank account within 30 days.
Documents Needed
- Electricity bill (latest)
- Aadhaar card
- Bank passbook or cancelled cheque
- Roof ownership proof or NOC
- Passport-size photo
Why "Up to ₹78,000" — and Why There's No Telangana State Top-Up
The phrase "up to ₹78,000" trips people up, so here's the honest breakdown. The subsidy is tiered: ₹30,000 for the first kW, ₹30,000 for the second (₹60,000 at 2 kW), and ₹18,000 for the third — which is how a 3 kW system reaches the ₹78,000 ceiling. Go above 3 kW and the subsidy doesn't keep climbing; ₹78,000 is the hard cap for residential. This is exactly why we recommend 3 kW as the minimum size for most homes: it's the point where you extract every rupee of available subsidy. A 2 kW system leaves ₹18,000 of subsidy on the table for the sake of one more kW of panels.
The other thing worth being straight about: some other states add their own subsidy on top of the central PMSG amount. Telangana currently does not. You'll occasionally see marketing that implies a bigger combined figure — treat that with caution. As of 2026, the ₹78,000 central subsidy is the only direct rooftop scheme active for Telangana residents. We'd rather you hear that from us upfront than discover it after signing.
Common Questions
How long does the process take, and why isn't it instant?
Total timeline is typically 30-60 days from application to subsidy credit, and it's worth understanding where that time goes so it doesn't feel like a black box. The bulk of it is DISCOM-side: the feasibility check and sanction letter usually take the longest, followed by the net metering inspection and the bi-directional meter installation. The actual solar installation is a day or two in the middle. The subsidy itself lands in your bank account only after commissioning is verified — it's a reimbursement, not an upfront discount, which is the single most common point of confusion.
I live in an apartment / flat — can I still claim it?
This depends on your electricity connection, not just your building. If you own a top-floor flat with exclusive terrace rights and your own individual DISCOM meter, you can apply on the individual residential track. If your flat is on a shared building meter, you can't claim PMSG individually — but your housing society can apply for common-area solar under the group housing track. It's a genuinely common situation in Hyderabad, and the answer varies flat by flat, so it's worth a quick check rather than assuming either way.
Can I get subsidy for commercial property?
No — PM Surya Ghar is residential only. Commercial and industrial properties can still install solar and benefit from net metering and accelerated depreciation, but not from this particular subsidy.
What if my application is rejected?
The good news is that most rejections are fixable rather than final. The usual causes are an incorrect consumer number, a name mismatch between your electricity connection and your Aadhaar, insufficient usable roof space, or a duplicate application against the same connection. Each of these is a correct-and-resubmit situation, not a permanent no. Because we file these regularly, we tend to catch these issues before submission rather than after a rejection — which is a large part of why using an experienced installer saves you a wasted cycle.
Need Help Applying? We Handle Everything.
Sri Ishaan Solar manages the entire subsidy process — from application to installation to DISCOM approval. You just need to provide the documents.