Looking for a trusted solar installer in Uppal? Sri Ishaan Solar has been installing rooftop solar across the East Hyderabad IT growth zone since 2017. We handle everything — site survey to DISCOM net metering to PMSG subsidy paperwork.

Uppal quick facts

Why Go Solar in Uppal?

Uppal's mix of residential colonies and industrial estates makes it an excellent solar market. Telangana averages 5.5–6 peak sun hours per day — ideal for maximising rooftop output. Residential households can cut bills by 60–80% with a 3–5 kW system; industrial units with high daytime loads can achieve payback in under 3 years with accelerated depreciation. The PM Surya Ghar subsidy of ₹78,000 is available to residential consumers installing 3 kW and above.

Solar Panels in Uppal — Installation & Price Guide (2026)

SystemGross CostPMSG SubsidyNet After SubsidyEst. monthly saving
3 kW₹2,10,000₹78,000₹1,32,000~₹2,500
5 kW₹3,50,000₹78,000₹2,72,000~₹4,500
10 kW₹6,00,000₹78,000₹5,22,000~₹8,500

* Indicative — costs and monthly savings depend on system size, roof type, inverter brand, local tariff, and consumption pattern. WhatsApp us for a free site-specific quote.

What's specific to Uppal

Uppal is the eastern gateway to Hyderabad, built around the Uppal ring junction near the Rajiv Gandhi International Cricket Stadium. It's a fast-growing belt of independent houses and new gated communities spreading east of the ORR, with warehousing and industry close by — a good mix for solar:

Areas of Uppal we cover

Our engineers regularly survey and install across the wider Uppal area, including:

Ramanthapur · Boduppal · Peerzadiguda · Uppal Bhagayath · the surrounding HMDA layouts · and the adjoining Nagole belt

Not sure if we reach your street? WhatsApp your location — if you're in or around Uppal, we'll be there for a free survey within 48 hours.

TGSPDCL Net Metering — How We Handle It

Uppal is on the TGSPDCL distribution network. We handle the full net-metering application end-to-end — feasibility request, single-line drawing, MNRE-format application, vendor empanelment proof (TSRE260936), and bi-directional meter installation coordination. Typical timeline: 30–45 days from application to subsidy credit. You don't visit any DISCOM office.

Why Uppal residents pick Sri Ishaan Solar

After installation — what we do for Uppal customers

We've done several MSME factory rooftops in Uppal — happy to share commercial references.

How Solar Installation Works in Uppal

  1. Free site survey — Our engineer visits your Uppal property within 48 hours, assesses roof area, shading, load, and DISCOM connection. No cost, no commitment.
  2. DISCOM application — We submit the complete TGSPDCL net metering application on your behalf — feasibility request, single-line diagram, and all MNRE-format documents. You don't visit any office.
  3. Installation — Our certified team installs panels, inverter, and cabling in 1–2 days. We use Tier-1 DCR-compliant panels (Adani / Waaree / Tata / Trina) and a 5-year workmanship warranty covers all labour.
  4. Net meter & go live — TGSPDCL installs the bidirectional meter (typically 30–60 days after application). Once live, surplus units export to the grid and your PM Surya Ghar subsidy of ₹78,000 is credited directly to your bank account.

Frequently Asked Questions — Solar in Uppal

How much does solar cost in Uppal?

A 3 kW system costs ₹2,10,000 gross — just ₹1,32,000 net after the ₹78,000 PM Surya Ghar subsidy. A 5 kW system is ₹3,50,000 gross, ₹2,72,000 net after subsidy. A 10 kW residential system costs ₹6,00,000 gross — ₹5,22,000 net after the ₹78,000 PM Surya Ghar subsidy (capped at 3 kW and above). All prices confirmed at the free site survey.

Is PM Surya Ghar subsidy available in Uppal?

Yes. The PM Surya Ghar Muft Bijli Yojana provides ₹78,000 subsidy for residential systems of 3 kW and above in Uppal. The subsidy is credited directly to your bank account after installation and TGSPDCL approval. Sri Ishaan Solar submits the full subsidy application as part of our service.

How long does installation take in Uppal?

Physical installation takes 1–2 days. The TGSPDCL net meter connection and PM Surya Ghar subsidy credit typically take 30–60 days after installation. We manage all paperwork end-to-end — you don't visit any DISCOM office at any point.

Which solar company serves Uppal?

Sri Ishaan Solar, based in Bandlaguda, Hyderabad, serves Uppal and the East Hyderabad industrial zone. We have completed multiple MSME factory rooftop projects in Uppal and are TGREDCO empanelled (Reg. TSRE260936). Call or WhatsApp us at +91 78424 61888.

Get a Free Quote for Uppal