Solar Panel Installation in Adilabad — TGREDCO Empanelled Installer

Sri Ishaan Solar — Serving Adilabad since 2017 · TGREDCO Reg. TSRE260936

ఆదిలాబాద్‌లో సోలార్ వ్యవస్థ ఏర్పాటు చేసుకోండి — TSNPDCL నెట్ మీటరింగ్ మేమే చూసుకుంటాం.

Adilabad is the district headquarters of Adilabad district in the far north of Telangana, bordering Maharashtra and Chhattisgarh. It falls under TSNPDCL (Northern DISCOM) and is one of Telangana's most forested and tribal districts. Sri Ishaan Solar handles rooftop solar installations in Adilabad end-to-end — from free site survey and TSNPDCL net metering application to PM Surya Ghar subsidy processing and commissioning.

Adilabad quick facts

Why Adilabad is Well-Suited for Solar

Telangana receives an average solar irradiance of approximately 5.5 kWh per square metre per day across the state, and Adilabad is no exception. This reliable solar resource means a grid-tied rooftop system here generates consistently throughout the year, including winter months. The TSNPDCL electricity tariff structure, with progressive slabs for higher consumption, means households using more than 200 units per month see strong savings from a 3–5 kW system.

Adilabad town itself has standard RCC flat-roof residential construction. The surrounding district has diverse terrain including forest land and tribal habitations (ITDA areas). For town properties, standard grid-tied solar with TSNPDCL net metering is straightforward. For rural or off-grid properties in the district, hybrid solar with battery storage may be more suitable.

Solar Pricing in Adilabad (2026)

SystemGross CostPMSG SubsidyNet After SubsidyEst. monthly saving
3 kW₹2,10,000₹78,000₹1,32,000~₹2,500
5 kW₹3,50,000₹78,000₹2,72,000~₹4,000
10 kW₹5,10,000₹5,10,000~₹8,000
15 kW₹7,25,000₹7,25,000~₹12,000

* Indicative — costs depend on system size, roof type, inverter brand, local tariff, and consumption. WhatsApp us for a free site-specific quote.

TSNPDCL Net Metering in Adilabad — How It Works

Adilabad is served by TSNPDCL. Sri Ishaan Solar manages the complete net metering process — you visit no DISCOM office:

  1. Feasibility check — we verify your TSNPDCL consumer number and sanctioned load.
  2. MNRE-format application — we prepare the single-line diagram, site layout, and TGREDCO empanelment certificate (TSRE260936) and submit to TSNPDCL.
  3. Meter coordination — TSNPDCL installs the bidirectional meter; we follow up until it is commissioned.
  4. Subsidy credit — PM Surya Ghar subsidy of up to ₹78,000 is credited directly to your bank account after inspection. Total timeline: 30–50 days from installation.

What We Offer in Adilabad

How Solar Installation Works in Adilabad

  1. Free site survey — we visit your Adilabad property at no cost. Our engineer assesses roof area, shading, sanctioned load, and TSNPDCL consumer number.
  2. TSNPDCL net metering application — we prepare and submit all documents on your behalf.
  3. Installation — our certified crew installs panels, grid-tied inverter, and cabling in 1–2 days.
  4. Net meter goes live — TSNPDCL installs the bidirectional meter; surplus units export to the grid. PM Surya Ghar subsidy credited to your bank account upon DISCOM approval.

Frequently Asked Questions — Solar in Adilabad

Which DISCOM covers Adilabad for solar net metering?

Adilabad falls under TSNPDCL (Northern DISCOM). All net metering applications and bidirectional meter coordination are handled through TSNPDCL. Sri Ishaan Solar manages the full TSNPDCL application process end-to-end.

What is the PM Surya Ghar subsidy in Adilabad?

The PM Surya Ghar Muft Bijli Yojana provides ₹78,000 for residential systems of 3 kW and above. The subsidy is uniform across all Telangana districts including Adilabad — there is no additional state top-up. It is credited directly to your registered bank account after TSNPDCL inspection and MNRE portal approval.

How long does solar installation take in Adilabad?

Physical installation takes 1–2 days. TSNPDCL net metering application and bidirectional meter connection typically takes 30–50 days. The PM Surya Ghar subsidy is credited approximately 7–10 days after DISCOM inspection. We manage all follow-ups on your behalf.

Do I need any permissions to install solar in Adilabad?

For residential rooftop systems up to 10 kW, no separate municipal NOC is generally required in Adilabad under Telangana's solar policy. The TSNPDCL net metering approval serves as the authorisation to connect to the grid. Sri Ishaan Solar will advise if any site-specific clearances are needed.

Get a Free Quote for Adilabad

Get Free Quote on WhatsApp →    +91 78424 61888

District page: Adilabad District →

← Back to Sri Ishaan Solar