పిఎం సూర్య ఘర్ స్కీమ్ కోసం దరఖాస్తు చేయడం ఎలా? If you are a homeowner in Hyderabad or anywhere in Telangana and want to claim the PM Surya Ghar subsidy — up to ₹78,000 — this guide walks you through every step. We have helped over 100 families complete this process since 2017, and we offer free assistance to every customer.
What is PM Surya Ghar Muft Bijli Yojana?
PM Surya Ghar Muft Bijli Yojana is a central government scheme launched in 2024 to promote rooftop solar adoption across India. It provides a direct subsidy of up to ₹78,000 to residential households that install a grid-connected rooftop solar system. The subsidy is credited directly to your bank account via Direct Benefit Transfer (DBT) — no middlemen, no cash involved.
For Telangana households, this scheme works through TSSPDCL (Telangana State Southern Power Distribution Company) covering Hyderabad and southern Telangana, and TSNPDCL covering northern districts like Nizamabad, Karimnagar, and Warangal.
Who is Eligible for PM Surya Ghar in Telangana?
- You must own the property where the solar system will be installed (renters are not eligible)
- You must have an active TSSPDCL or TSNPDCL electricity connection at that property
- The property must be in a grid-connected area — almost all urban and semi-urban areas in Telangana qualify
- The system must be for residential use — commercial establishments are not eligible under PMSG
- You must have an Aadhaar-linked bank account for subsidy credit
- One subsidy per electricity consumer number (one per household)
PM Surya Ghar Application Process — Step by Step
The total process has six stages and typically completes in 30–60 days. Here is exactly what happens at each stage.
Step 1: Register on pmsuryaghar.gov.in
Go to pmsuryaghar.gov.in and click "Apply for Rooftop Solar." Select your state as Telangana, your DISCOM (TSSPDCL or TSNPDCL), and enter your electricity consumer number (found on your electricity bill). Complete mobile OTP verification, then fill in your Aadhaar number and bank account details for DBT. Choose the system size you want — 1 kW, 2 kW, or 3 kW and above.
Time required: 20–30 minutes. Documents needed: electricity bill, Aadhaar, bank account.
Step 2: Wait for DISCOM Technical Feasibility Approval
After you apply, TSSPDCL or TSNPDCL reviews your application. They may conduct a physical site visit to assess your roof area, existing meter load, and grid connection capacity. If your connection is suitable, they issue a technical feasibility approval. You will receive an SMS and email notification. This takes 7–15 working days. If rejected, they will explain the reason — common reasons include insufficient roof space or load capacity, which are usually resolvable.
Timeline: 7–15 working days. No action needed from you — just wait for the notification.
Step 3: Select an MNRE-Empanelled Installer
Once approved, log back into the PMSG portal and select a registered, MNRE-empanelled vendor for your area. Sri Ishaan Solar is empanelled and registered with TGREDCO (Reg. No. TSRE260936). You can also contact us first — we will help you complete the registration and vendor selection on your behalf at no extra cost. Choosing a registered vendor is mandatory; subsidy is not applicable if you use an unlisted installer.
WhatsApp us: +91 78424 61888 — we handle the full process for free.
Step 4: Solar System Installation
Your empanelled installer completes the rooftop solar installation — solar panels, inverter, mounting structure (GI/aluminium), DC and AC cabling, earthing, and surge protection. For a standard 3 kW system, installation takes 1–2 days. We use Tier-1 panels (Waaree, Adani, Tata) and Growatt/Goodwe inverters, all with manufacturer warranties. No payment is made to DISCOM at this stage — all payments go directly to your installer.
Duration: 1–3 working days depending on system size and roof complexity.
Step 5: DISCOM Net Meter Installation
After installation, your installer submits a commissioning request to TSSPDCL or TSNPDCL with all technical documents. The DISCOM then installs a bi-directional net energy meter at your premises. This meter records both electricity you consume from the grid and excess solar electricity you export back. Sri Ishaan Solar handles all paperwork and follows up with DISCOM on your behalf. DISCOM issues a commissioning certificate once the net meter is live.
Timeline: 15–30 working days. We track and follow up — you don't need to visit any office.
Step 6: Subsidy Credited via Direct Benefit Transfer
After commissioning, your installer submits the final commissioning details on the PMSG portal. The National Portal verifies the data and transfers the subsidy — ₹30,000 for 1 kW, ₹60,000 for 2 kW, or ₹78,000 for 3 kW and above — directly to your linked bank account. The transfer typically takes 30–45 days from commissioning. You will receive an SMS notification when the amount is credited.
Subsidy is credited directly to your bank account — no manual follow-up needed at the DISCOM office.
Documents Required for PM Surya Ghar Application
| Document | Purpose |
|---|---|
| Latest electricity bill | Consumer number, DISCOM details, load sanction |
| Aadhaar card | Identity verification, DBT linking |
| Bank passbook / cancelled cheque | Subsidy DBT credit |
| Roof/property photo | Technical feasibility assessment |
| Mobile number (Aadhaar-linked) | OTP verification on portal |
End-to-End Timeline
The full PM Surya Ghar process from registration to subsidy credit takes approximately 45–60 days in Telangana under normal conditions. Here is a typical timeline:
- Day 1–2: Online registration on pmsuryaghar.gov.in
- Day 3–17: DISCOM technical feasibility review (7–15 working days)
- Day 18–20: Vendor finalisation and agreement
- Day 21–23: Solar system installation (1–3 days)
- Day 24–50: DISCOM net meter installation (15–30 working days)
- Day 51–75: Subsidy credit to bank account (30–45 days from commissioning)
With an experienced installer like Sri Ishaan Solar who actively follows up with TSSPDCL/TSNPDCL, the process often completes faster — many of our customers have received their subsidy within 45 days.
Frequently Asked Questions
Who is eligible for PM Surya Ghar in Telangana?
Any homeowner with a valid TSSPDCL or TSNPDCL electricity connection in a grid-connected area is eligible. Renters are not eligible. One subsidy per consumer number.
How much PM Surya Ghar subsidy will I get?
₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW and above. This is the maximum central subsidy. There is no additional Telangana state top-up subsidy currently active.
Can I apply for PM Surya Ghar without a vendor?
You can register on pmsuryaghar.gov.in independently, but you must select an MNRE-empanelled vendor for installation. The subsidy is only processed when an empanelled vendor submits the commissioning details on your behalf.
What if my PM Surya Ghar application is rejected?
Common rejection reasons include insufficient load sanction (easily resolved by applying for a load enhancement at TSSPDCL), inadequate roof space, or data mismatch. Contact us — Sri Ishaan Solar has resolved many such cases for our customers.
Do I pay anything upfront before the subsidy is credited?
Yes — you pay the full installation cost to the vendor first. The subsidy is credited to your bank account after commissioning (typically within 30–45 days). Some installers offer bridge financing or phased payment options. Contact us to discuss payment plans.
Does the 3 kW system give free electricity every month?
A 3 kW solar system in Hyderabad typically generates 300–360 units per month, which covers most of a mid-sized home's electricity consumption. Excess units are exported to the grid and credited to your next electricity bill through net metering.
Get Free Help with Your PM Surya Ghar Application
Sri Ishaan Solar handles the complete application for our customers — registration, vendor selection, DISCOM follow-ups, and subsidy tracking. No extra charge. WhatsApp us to start.
WhatsApp for Free Help → Call +91 78424 61888100+ installations across Telangana | TGREDCO Reg. TSRE260936 | Since 2017
Last updated: May 2026