← Sri Ishaan Solar Home

నెట్ మీటరింగ్ ప్రాసెస్ తెలంగాణ 2026 — Complete Guide

Net Metering Process in Telangana 2026 — Step by Step

Updated April 2026 | By Sri Ishaan Solar Team

Solar panels install చేయించాక, net metering ద్వారా మీ electricity bill dramatically తగ్గుతుంది. Telangana లో TSSPDCL / TSNPDCL net metering process, documents, timeline — complete guide.

నెట్ మీటరింగ్ — ఎలా Work చేస్తుంది?

Net metering లో మీ ఇంట్లో bidirectional meter install అవుతుంది:

Example:

Step-by-Step Process — TSSPDCL & TSNPDCL

Step 1: Online Application (Day 1)

TSSPDCL: www.tssouthernpower.com
TSNPDCL: www.tsnpdcl.in

Consumer number, Aadhaar, proposed system size, vendor details upload చేయండి.

Step 2: Technical Feasibility Study (Day 1-15)

DISCOM engineer site visit → transformer capacity check → grid stability assessment → feasibility report.

Step 3: Approval Letter (Day 15-20)

Feasibility positive అయితే approval letter issue. System specifications, conditions mention చేస్తారు.

Step 4: Installation (Day 20-35)

Approved vendor (Sri Ishaan Solar) ద్వారా installation. DISCOM specifications ప్రకారం exact system install.

Step 5: Completion Report (Day 35-40)

Installation complete → completion report + photos + test certificates DISCOM కి submit.

Step 6: DISCOM Inspection (Day 40-50)

DISCOM inspector site visit → system verification → safety compliance check → meter testing.

Step 7: Bidirectional Meter Installation (Day 50-55)

Old unidirectional meter replace → new bidirectional meter install → import/export readings start.

Step 8: Commissioning Certificate (Day 55-60)

Final commissioning certificate issue → net metering officially start → savings begin!

Required Documents

DocumentDetails
Electricity BillLatest bill with consumer number
Aadhaar CardConnection holder
Property DocumentOwnership proof / patta
Roof PhotosBefore installation
Single Line DiagramElectrical SLD (vendor provides)
Panel/Inverter CertificatesTest certificates (vendor provides)
Vendor EmpanelmentMNRE/TSREDCO registration (vendor provides)

Note: Technical documents (SLD, certificates, empanelment) — Sri Ishaan Solar provide చేస్తుంది. మీ దగ్గర Aadhaar, bill, property proof ఉంటే enough.

Net Metering Rules — Telangana Specifics

TSSPDCL vs TSNPDCL — Key Differences

ParameterTSSPDCLTSNPDCL
CoverageHyderabad, Rangareddy, Mahbubnagar, Nalgonda, KhammamWarangal, Karimnagar, Nizamabad, Adilabad, Medak
Processing Time45-60 days45-60 days
Helpline19121912
Online Portaltssouthernpower.comtsnpdcl.in

Common Issues & Solutions

Issue: Transformer capacity full — application rejected

Solution: Request transformer upgrade or apply for next phase. Some areas have waiting lists.

Issue: Inspection delayed

Solution: Follow up through DISCOM portal + helpline. Sri Ishaan Solar follows up on behalf of customers.

Issue: Meter reading discrepancy

Solution: Compare inverter monitoring data with meter readings. File complaint if mismatch.

We Handle Full Net Metering Process

Net metering paperwork complex గా ఉంటుంది — మీరు worry చేయకూడదు. Sri Ishaan Solar:

Net Metering Help on WhatsApp →

Or call: +91 78424 61888

Related Articles

← Back to Sri Ishaan Solar